Municipal Water Supply
Reliable PVC-U pipe production for demanding infrastructure projects.
01 PVC PIPE EXTRUSION LINE
Dual-output PVC-U pipe production for conduit, water supply and irrigation pipe.
Conical twin-screw extrusion, dual-channel vacuum sizing, synchronized traction and chip-free cutting.
20~63mm Dual-Head PVC Pipe Extrusion Line is specially designed for producing PVC-U electrical conduit, water supply pipe and agricultural irrigation pipe. Equipped with a single conical twin-screw extruder matched with dual extrusion die heads, the line extrudes two pipes simultaneously, doubling production capacity while reducing investment, floor space and labor cost compared with two separate single-outlet lines. Independent dual-channel vacuum sizing, traction and cutting keep both pipes precise, stable and smooth.






Reliable PVC-U pipe production for demanding infrastructure projects.

Reliable PVC-U pipe production for demanding infrastructure projects.

Reliable PVC-U pipe production for demanding infrastructure projects.

Reliable PVC-U pipe production for demanding infrastructure projects.
Stable output supports efficient continuous production.
Precise control keeps product quality stable.
Precise control keeps product quality stable.
Covers key pipe sizes for flexible production.
Optimized screw design improves plasticizing stability.
Precise control keeps product quality stable.
Reliable drive control keeps operation stable.






| Model | Pipe Range | Extruder Model | Main Motor Power | Max. Line Speed | Max. Output |
|---|---|---|---|---|---|
| BQS40-2 | 16~40 | SJZ51/105 | 18.5 KW | 10 m/min. | 120 kg/h |
| BQS63-2 | 20~63 | SJZ65/132 | 37 KW | 15 m/min. | 250 kg/h |
| BQS63 | 20~63 | SJZ51/105 | 18.5 KW | 15 m/min. | 120 kg/h |
| BQS160 | 50~160 | SJZ65/132 | 37 KW | 8.0 m/min. | 250 kg/h |
| BQS200 | 63~200 | SJZ65/132 | 37 KW | 3.5 m/min. | 250 kg/h |
| BQS315 | 160~315 | SJZ80/156 | 55 KW | 2.0 m/min. | 350 kg/h |
| BQS630 | 315~630 | SJZ92/188 | 110 KW | 1.2 m/min. | 600 kg/h |
Integrated factory and exporter with independent R&D, mould machining, complete machine inspection, and overseas commissioning support.






Polestar Machinery arranges machine packing, container loading checks, and export delivery coordination for plastic extrusion lines and auxiliary equipment.












Reasons: Blocked feeding system, uneven mixing of raw materials, worn screw/barrel, unstable main motor frequency. Solutions: Clean the feeder; check mixing formula; repair or replace worn screw; calibrate VFD parameters.
Reasons: Improper heating temperature, wet raw materials, mismatched screw speed, unmelted resin particles. Solutions: Dry raw materials fully; adjust barrel temperature curve; optimize screw rotation speed.
PVC is heat-sensitive and decomposes easily under local overheating. General causes: Long material residence time, damaged temperature sensors, degraded recycled materials. Solutions: Lower overheated zone temperature; clean mold dead zones; add qualified heat stabilizer for PVC formula.
Reasons: Low barrel temperature, blocked screen pack, foreign objects inside barrel, excessive filler content. Solutions: Raise temperature moderately; replace screen mesh; clean foreign debris; adjust filler proportion.
Reasons: Scratched mold inner cavity, accumulated impurities, worn die lip, precipitated lubricant residues. Solutions: Polish mold surface; disassemble & clean die regularly; replace damaged die lip.
Reasons: Offset mold center, unbalanced heating rings around die, partial blocked melt channels. Solutions: Re-center the mandrel; check and replace faulty heating bands; clear blocked flow paths.
Reasons: Loose clamping bolts, aging sealing gaskets, uneven thermal expansion of die components. Solutions: Retighten bolts evenly; replace damaged gaskets; balance mold heating temperature.
Reasons: Unbalanced melt flow inside mold, unreasonable mandrel structure, unstable melt pressure. Solutions: Optimize internal mold flow channel design and stabilize extruder output pressure.